2022 Projects

Current Detours

  1. June 6, 2022 - June 10, 2022
    City of Nowthen
    Culvert Replacement
    CSAH 24 (Norris Lake Road NW) 

  2. Closed through June 30, 2022
    City of Coon Rapids
    Road Construction
    TH 610 Westbound On Ramp


  3. May 2, 2022 through July 17, 2022
    City of Blaine
    Road Construction
    Eastbound CSAH 14 (125th Avenue NE) between Harpers Street and CSAH 17 (Lexington Avenue)

  4. September 2, 2021 - Until Further Notice
    City of St. Francis
    Updated Notice of Bridge Restriction / Detour for Overweight Vehicles
    Weight Limit 32 Tons per Vehicle
    CSAH 28 (Ambassador Blvd NW)
         at Bridge over Seelye Brook

2022 Culvert Pipe Replacement Program

County
Road #

Road Name

City

Description
76Fawn Lake Drive NEEast Bethel500 feet West of Sunset Road NE
24Norris Lake Road NWNowthen1000 feet North of Pinnaker Road NW
32Ash StreetLino Lakes200 feet East of Centerville Road
32Ash StreetLino Lakes1100 feet West of Centerville Road
19Potomac Street NEColumbus25 feet South of 151st Avenue
116Bunker Lake Blvd NEHam Lake250 feet West of Guadalcanal St NE 
21Centerville RoadLino Lake1300 feet South of Birch Street
64181st Avenue NWNowthen200 feet West of Xenolith Street
64181st Avenue NWNowthen1800 feet East of Rabbit St NW
63Green Valley Road NWRamsey1/4 Mile West of TH 47
21Centerville RoadLino Lakes1500 feet North of Ash Street
18Broadway AvenueColumbus50 feet West of Lyons Street
54West Freeway DriveColumbus1300 feet North of 35W


2022 Construction Projects

109th Avenue (CSAH 12) Pedestrian Ramp Improvement Project

Four pedestrian ramp pairs, at the intersections of 109th Avenue (CSAH 12) with 6th Street, Terrace Road, Quincy Boulevard, and Buchanan Street, will be reconstructed in partnership with MnDOT. These projects will increase the walkability of the area, and also provide contracting opportunities to local small businesses for the construction. Each intersection will be redone individually as a small business contract. Construction is anticipated for Summer 2022.

125th Avenue (CSAH 14) Reconstruction - Harpers Street to Lexington Avenue (CSAH 17)

CSAH 14 will be upgraded from a two-lane rural section to a four-lane divided urban section from Harpers Street to CSAH 17.  The project will incorporate a multi-use bituminous trail within the corridor, along with a traffic control signal at the intersection of North Lake Boulevard and Legacy Creek Parkway.

Coon Rapids Boulevard (CSAH 1) and Blackfoot Street Signal Replacement

Anoka County, in partnership with the City of Coon Rapids, is developing a preliminary layout for replacing and updating the existing signal system at CSAH 1 (Coon Rapids Boulevard) and Blackfoot Street.  Construction is tentatively scheduled for 2022.

Foley Boulevard (CSAH 11) - BNSF Railway Grade Separation

Foley Boulevard, from East River Road to Coon Rapids Boulevard, will be reconstructed to a four-lane divided highway over the BNSF railroad tracks.  Additional pedestrian and traffic safety improvements will also be made during this construction.

Below is a time-lapse video of Foley Boulevard RR bridge project from July 1, 2021 - May 21, 2022.

West Freeway Drive Realignmet

Anoka County received a Local Road Improvement Program grant to fund a portion of the realignment and reconstruction of West Freeway Drive, north of CSAH 23 (Lake Drive), which is a City roadway under the jurisdiction of City of Columbus.  In addition, the City of Columbus has received funding thru the State Park Road Account to fund road improvements for the access into onto the DNR’s Lamprey Pass Wildlife Management Area (LPWMA).  Recent County and MnDOT geometric improvements on Lake Drive and TH 97 have changed the existing West Freeway Drive access to a right-in/right-out only.

2022 Overlay Program

Phase I (North) - starting May 2, 2022 through July 1, 2022

Baugh Street (CSAH 22) from 181st Avenue (CSAH 22) to Viking Boulevard (CSAH 22) – Overlay

Nightingale Street / 237th Avenue (CSAH 24) from 229th Avenue (CSAH 24) to University Avenue (CSAH 13) – Reclaim and Overlay

Viking Boulevard (CSAH 65) from Sherburne & Anoka County line to Baugh Street (CSAH 22) – Reclaim and Overlay

223rd Avenue (CR 70) from Jarvis Street (CR70) to Sugar Bush Street (CR70) – Reclaim and Overlay

221st Avenue (CR74) from Cedar Drive (CSAH 13) to TH 65 - Reclaim and Overlay

Fawn Lake Drive (CR76) from Fawn Lake Drive / Naples Street (CSAH 24) to Typo Creek Drive (CSAH 85) - Reclaim and Overlay

2022 MnDOT Projects in Anoka County

US Highway 10/169 Improvements - Anoka Solution - Greater MN Gateway

The US Highway 10/169 Improvement Project will include reconstruction of three intersections (Thurston Avenue, Fairoak Avenue, and Main Street), pedestrian walkway improvements and frontage road improvements. The improvements would reduce congestion, increase safety, and provide a more reliable route through the area.   Construction is scheduled for 2022-2023.